> ## Content Index
> Fetch the complete content index at: https://signal-engine.ghost.io/llms.txt
> Use this file to discover other available public pages before exploring further.

# Intel signs its first outside customer for its most advanced chip process, and Microsoft signs up for its chip packaging. What Intel announced, what it did not say, and why it matters beyond the US
- URL: https://signal-engine.ghost.io/intel-18a-first-external-foundry-customer-microsoft-emib-what-it-means/
- Published: 2026-11-19T05:04:38.000Z
- Updated: 2026-11-19T05:04:38.000Z
- Description: Intel's chief executive says the company has signed its first outside customer for its 18A manufacturing process, without naming it. Separately, Microsoft will use Intel's EMIB chip packaging for its own Azure chips. Here is what was announced, what is still unknown, and why it matters.
- Author: John Caraher
- Tags: Issue 3, Chips & Hardware, Big Tech, AI, Markets & Money, #Import 2026-11-19 05:05

Updated 19 Nov 2026, 07:04 SAST

**The short version:** Intel's chief executive officer (CEO), Lip-Bu Tan, said on Wednesday, 18 November, that the company has signed the first outside customer for its 18A chip-making process, its most advanced[\[1\]](#cite-note-1)[\[2\]](#cite-note-2). He did not name the customer or give the value of the deal[\[1\]](#cite-note-1)[\[2\]](#cite-note-2). Intel's chief technology officer (CTO), Pushkar Ranade, later said on social media that the customer will use 18A-P, an improved version of the process[\[1\]](#cite-note-1)[\[2\]](#cite-note-2). In a separate announcement, Microsoft and Intel said Microsoft is the first company to announce use of Intel's EMIB packaging technology, which joins several chip pieces together, for chips it designs for its Azure cloud[\[3\]](#cite-note-3). The same agreement confirms several years of supply of Intel's Xeon server processors to Microsoft[\[3\]](#cite-note-3). For Intel, which has spent five years trying to make chips for other companies, CNBC calls the first 18A customer "a milestone moment"[\[1\]](#cite-note-1). Our [analysis](#why-it-matters-for-your-business-analysis) looks at why a stronger second source of advanced chips matters to businesses far from the US.

Contents

1. [What Intel announced](#what-intel-announced)  
  1. [18A-P, not plain 18A](#18a-p)
  2. [The yield figure](#yield-figure)
2. [What 18A is, in plain terms](#what-18a-is)
3. [Why outside customers matter so much to Intel](#why-outside-customers-matter)  
  1. [Earlier announcements](#earlier-announcements)
4. [Microsoft's packaging deal](#microsoft-packaging-deal)  
  1. [What packaging is](#what-packaging-is)
  2. [What the release does not say](#what-the-release-does-not-say)
5. [Who the 18A customer might be](#who-the-customer-might-be)
6. [Intel's tough year](#intels-tough-year)
7. [What we could not verify](#what-we-could-not-verify)
8. [Why it matters for your business (analysis)](#why-it-matters-for-your-business-analysis)  
  1. [More than one place to make advanced chips](#more-than-one-place)
  2. [What it means for cloud users](#cloud-users)
  3. [For firms buying computers and servers](#buying-computers)
  4. [Watch, do not act](#watch-do-not-act)
9. [Sources](#sources)

## What Intel announced

Tan made the comment at the TomorrowX Summit, an investment conference in Austin, Texas[\[1\]](#cite-note-1)[\[2\]](#cite-note-2). According to CNBC, he said: "Resilient supply on the foundry is very important", and then: "18A, I'm involved in production and we just signed the first customer"[\[1\]](#cite-note-1). The Oregonian/OregonLive reports the same remark, "according to remarks provided by the company"[\[2\]](#cite-note-2).

Three things were not disclosed:

- **Who the customer is.** Tan did not name the client[\[1\]](#cite-note-1)[\[2\]](#cite-note-2). The Oregonian reports that Intel has said before that it usually would not identify individual clients[\[2\]](#cite-note-2).
- **How big the deal is.** No financial terms were given[\[2\]](#cite-note-2). Crypto Briefing, a markets news site, notes that Intel gave "no figures on volume commitments, revenue impact, or who the customer is"[\[6\]](#cite-note-6).
- **When production starts.** None of the reports we read gives a date for the customer's chips.

### 18A-P, not plain 18A

After Tan spoke, Ranade clarified on X that the customer had signed up for 18A-P, CNBC and the Oregonian report[\[1\]](#cite-note-1)[\[2\]](#cite-note-2). CNBC says 18A-P went into "risk production" in June[\[1\]](#cite-note-1). Risk production is an early stage in which a factory makes chips in limited numbers on a new process before full-volume manufacturing. The Oregonian reports that Intel introduced its first chips on 18A at the start of this year, followed quickly by 18A-P, which it describes as "a more capable iteration"[\[2\]](#cite-note-2).

### The yield figure

Crypto Briefing reports that Tan also said yields on 18A have reached 70%, though it does not quote his words[\[6\]](#cite-note-6). Yield is the share of chips on each silicon wafer that come out working; a higher yield means cheaper chips and more of them. TrendForce, a Taiwan-based market research firm, repeats the 70% figure citing Crypto Briefing, and adds that when Tan took over in March 2025, 18A yields had been described as "horrible"[\[5\]](#cite-note-5). CNBC and the Oregonian did not report a yield figure in the articles we read[\[1\]](#cite-note-1)[\[2\]](#cite-note-2), so we treat the 70% as **reported** and not yet confirmed by a second independent outlet.

## What 18A is, in plain terms

Chip "processes" or "nodes" are the recipes a factory uses to make chips. Newer nodes pack more, smaller transistors into the same space, so chips can do more work while using less electricity. The Oregonian reports that Intel's engineers have made "steady progress" in closing the gap with Taiwan Semiconductor Manufacturing Co. (TSMC), the world's leading contract chipmaker, "offering more computing horsepower while using less electricity"[\[2\]](#cite-note-2).

Crypto Briefing explains that 18A combines two technologies Intel has been promoting: RibbonFET, a transistor design in which the control gate wraps around the channel that carries current, and PowerVia, which moves the wiring that delivers power to the back of the chip and leaves the front for signal wiring[\[6\]](#cite-note-6).

According to Crypto Briefing, 18A was originally developed mainly for Intel's own products, and outside customers had instead been steered towards 14A, a later node[\[6\]](#cite-note-6). It reports that Intel aims to release its first internal 14A product by late 2027, and expects outside 14A customers in 2028 to 2029[\[6\]](#cite-note-6). These timelines are **reported** by Crypto Briefing; we did not find them in the other sources we read.

## Why outside customers matter so much to Intel

For most of its history Intel has made only chips that it designed itself[\[2\]](#cite-note-2). Five years ago it said it would start offering its factories to other companies[\[2\]](#cite-note-2). In the chip industry, a company that manufactures chips designed by others is called a foundry[\[2\]](#cite-note-2). TSMC is the best-known example, and Samsung is another[\[6\]](#cite-note-6).

The Oregonian describes progress since then as "slow going"[\[2\]](#cite-note-2). It gives two reasons: Intel's manufacturing technology lagged the industry for many years, and prospective clients "may have been worried that Intel would poach their designs for Intel chips"[\[2\]](#cite-note-2). CNBC reports that, until now, Intel has had no "marquee customer" for its foundry business, and has mainly manufactured its own products at its factories, including a large new campus in Arizona[\[1\]](#cite-note-1).

CNBC quotes Ben Bajarin, an analyst at Creative Strategies, who called the deal "a huge win for foundry"[\[1\]](#cite-note-1).

### Earlier announcements

There is a nuance here. Tech Times reports that in February 2024 Microsoft said it planned to make a chip it designed on Intel's 18A process, without naming the product[\[4\]](#cite-note-4). In October 2025, Tom's Hardware reported, citing the newsletter SemiAccurate, that Intel was on track to make a future Microsoft AI processor on 18A or 18A-P[\[7\]](#cite-note-7). Tom's Hardware wrote at the time that Microsoft was the only major external customer Intel Foundry had officially landed for 18A[\[7\]](#cite-note-7). Tech Times says Microsoft has not confirmed the SemiAccurate report[\[4\]](#cite-note-4). So Wednesday's news is best read as Intel's chief executive saying a first outside customer has now formally signed, rather than the first time any outside company has been linked to 18A. Which company signed has not been disclosed.

## Microsoft's packaging deal

The second announcement is clearer, because both companies put their names to it. In a joint press release dated 17 November, Microsoft and Intel announced "an expansion of their decades-long collaboration under a long-term agreement" covering parts of Azure, Microsoft's cloud computing service[\[3\]](#cite-note-3). Tech Times reports it was published on Intel's newsroom on 18 November[\[4\]](#cite-note-4).

The release says[\[3\]](#cite-note-3):

- Microsoft is "the first company to announce use of Intel Foundry's EMIB" (Embedded Multi-die Interconnect Bridge) advanced packaging technology for Azure "first-party silicon", meaning chips Microsoft designs itself.
- The agreement confirms "multi-year Intel Xeon supply capacity", including next-generation server processors codenamed Diamond Rapids.
- The two companies will also work together on Compute Express Link (CXL), a way of attaching extra memory to servers; Intel QuickAssist Technology (QAT), which speeds up tasks such as compression and encryption; and confidential computing, which keeps data encrypted while it is being processed.

### What packaging is

Modern high-end chips are often built from several smaller pieces, called chiplets or dies, joined together in one package. CNBC describes advanced packaging as the step "where individual chips are packaged together and connected to the larger system", and says Intel is a leader in it[\[1\]](#cite-note-1). Tech Times explains that EMIB embeds small silicon "bridges" in the base of the package to connect the chiplets, while TSMC's competing CoWoS (chip-on-wafer-on-substrate) technology uses a larger silicon layer, called an interposer[\[4\]](#cite-note-4).

TrendForce reports that demand for AI chips is stretching TSMC's CoWoS capacity, and that cloud giants are looking for other suppliers[\[5\]](#cite-note-5). Tech Times cites Bernstein analysts' estimate that standard EMIB packaging costs "in the low hundreds of dollars per chip", compared with roughly $900 to $1,000 for CoWoS on an Nvidia Rubin-class accelerator[\[4\]](#cite-note-4). That is a **reported** analyst estimate, not a published price.

### What the release does not say

Tech Times points out that the release "does not say which Azure chip will use Intel's packaging, which manufacturing node it will be built on, when it will ship or what Microsoft will pay"[\[4\]](#cite-note-4). It also notes that being the first to *announce* use of EMIB is "not the same as being the first to use it"[\[4\]](#cite-note-4). And because packaging is a separate step from making the chips themselves, Tech Times says Microsoft could use Intel's packaging while still having the chips made elsewhere; it labels that point its own inference[\[4\]](#cite-note-4).

The release includes two performance claims: "up to 2.3x" better performance for some Azure virtual machines using CXL memory, and "up to 2.5x" faster database backups using QAT[\[3\]](#cite-note-3). Tech Times examined the footnotes and reports that in both cases the comparison systems also differ in processor count and memory size, so neither figure isolates the effect of the feature being credited[\[4\]](#cite-note-4). Microsoft and Intel did not respond to that point in anything we read.

## Who the 18A customer might be

Neither company has said. Analysts and outlets have offered guesses, which we report as speculation, not fact:

- CNBC reports that Bajarin pointed to Nvidia, Apple, or the large cloud companies that design their own processors[\[1\]](#cite-note-1). He told CNBC that "Amazon, Microsoft and Google are struggling to get capacity for their CPU ambitions at TSMC"[\[1\]](#cite-note-1).
- CNBC also notes reports in May that Apple and Intel were close to a deal for Intel to make some chips for Apple devices[\[1\]](#cite-note-1).
- TrendForce suggests Microsoft "may also be in the running", given the new packaging deal and the earlier SemiAccurate report[\[5\]](#cite-note-5).

None of these is confirmed. Apple, Nvidia, Amazon and Google did not comment in the reports we read.

## Intel's tough year

The announcements come at a difficult time for Intel. CNBC reports that Intel's share price has lost more than half its value since the end of September, mostly after the company warned late last month that revenue this quarter would be at least $1 billion below analysts' estimates because of a slump in personal computer (PC) sales and supply chain problems[\[1\]](#cite-note-1).

The Oregonian reports that Intel does not have enough manufacturing capacity for its own chips[\[2\]](#cite-note-2). It says AI has created strong demand for central processing units (CPUs), the main chips in computers and servers and Intel's main product, but that Intel is losing market share because competitors have more chips available[\[2\]](#cite-note-2). Citing analytics firm Mercury Research, it reports Intel's share of chips using the x86 design standard fell below 70% last summer, from 74% a year earlier, with rival AMD taking nearly all of that share[\[2\]](#cite-note-2). The Oregonian says Intel is adding capacity across its factories and reviving plans for new plants in Ohio[\[2\]](#cite-note-2).

CNBC reports that Tan said in late October that he sees the global market for server processors growing as much as five times over the next five years, to about $200 billion, but that Intel cannot currently meet customer demand[\[1\]](#cite-note-1). CNBC also recalls that the US government took a 10% stake in Intel in August 2025, and that Nvidia followed with a $5 billion investment[\[1\]](#cite-note-1).

## What we could not verify

- **The customer's name.** Not disclosed by Intel[\[1\]](#cite-note-1)[\[2\]](#cite-note-2).
- **The 70% yield figure.** Reported by Crypto Briefing and repeated by TrendForce, but not in CNBC's or the Oregonian's reports ([see above](#yield-figure))[\[6\]](#cite-note-6)[\[5\]](#cite-note-5).
- **Deal size and dates.** No figures for volume, revenue or production start were given[\[2\]](#cite-note-2)[\[6\]](#cite-note-6).
- **Which Azure chip uses EMIB.** Not named in the release[\[3\]](#cite-note-3)[\[4\]](#cite-note-4).

## Why it matters for your business (analysis)

Analysis This section is our analysis, based on the reporting above. It is not news reporting, and it is not investment advice.

### More than one place to make advanced chips

CNBC describes the hope in the US of replacing "an almost complete reliance on Taiwan" for advanced chips[\[1\]](#cite-note-1). When capacity is tight, as TrendForce reports it is for AI chip packaging ([see packaging](#what-packaging-is))[\[5\]](#cite-note-5), the effects spread: cloud capacity becomes harder to get, and server prices and delivery times can suffer. A working second source would, over time, give chip designers more choice. One signed customer and one packaging deal do not create that on their own, but they are steps in that direction, if Intel delivers.

### What it means for cloud users

South African businesses that use Microsoft Azure, directly or through a local partner, will not see any change from this announcement soon. The release talks about "multi-year" supply and future chip generations ([see the deal](#microsoft-packaging-deal))[\[3\]](#cite-note-3). The practical lesson from Tech Times' reading of the footnotes is useful at any time: when a supplier claims something is "up to" two or three times faster, check what it was compared with, and test your own workloads before moving ([see what the release does not say](#what-the-release-does-not-say))[\[4\]](#cite-note-4).

### For firms buying computers and servers

Intel's capacity shortage and AMD's gains ([see Intel's tough year](#intels-tough-year))[\[2\]](#cite-note-2) matter to anyone buying laptops or servers. If one supplier is short, the choice of models and delivery dates from local resellers can change. A simple habit is to ask suppliers about both Intel- and AMD-based options when getting quotes, and to plan replacement cycles with some slack.

### Watch, do not act

This is a story to watch rather than act on. The real test is whether the unnamed customer's chips reach volume production on time, and whether more customers follow. Until then, there is nothing a business needs to change. Our wider coverage of the chip supply chain, including [the ten-country supply-chain pact](https://signal-engine.ghost.io/pax-silica-san-francisco-declaration-ai-supply-chains-africa/) and [the US rule on remote access to AI chips](https://signal-engine.ghost.io/us-closes-ai-chip-cloud-loophole-china-remote-access/), gives more background on why where chips are made has become a business question.

## Sources

1. [↩a](#cite-ref-1-a) [↩b](#cite-ref-1-b) [↩c](#cite-ref-1-c) [↩d](#cite-ref-1-d) [↩e](#cite-ref-1-e) [↩f](#cite-ref-1-f) [↩g](#cite-ref-1-g) [↩h](#cite-ref-1-h) [↩i](#cite-ref-1-i) [↩j](#cite-ref-1-j) [↩k](#cite-ref-1-k) [↩l](#cite-ref-1-l) [↩m](#cite-ref-1-m) [↩n](#cite-ref-1-n) [↩o](#cite-ref-1-o) [↩p](#cite-ref-1-p) [↩q](#cite-ref-1-q) [↩r](#cite-ref-1-r) [↩s](#cite-ref-1-s) [↩t](#cite-ref-1-t) [↩u](#cite-ref-1-u) CNBC (Katie Tarasov), [“Intel signs first external customer for advanced 18A chips”](https://www.cnbc.com/2026/11/18/intel-first-18a-foundry-customer.html?ref=signal-engine.ghost.io), 18 November 2026.
2. [↩a](#cite-ref-2-a) [↩b](#cite-ref-2-b) [↩c](#cite-ref-2-c) [↩d](#cite-ref-2-d) [↩e](#cite-ref-2-e) [↩f](#cite-ref-2-f) [↩g](#cite-ref-2-g) [↩h](#cite-ref-2-h) [↩i](#cite-ref-2-i) [↩j](#cite-ref-2-j) [↩k](#cite-ref-2-k) [↩l](#cite-ref-2-l) [↩m](#cite-ref-2-m) [↩n](#cite-ref-2-n) [↩o](#cite-ref-2-o) [↩p](#cite-ref-2-p) [↩q](#cite-ref-2-q) [↩r](#cite-ref-2-r) [↩s](#cite-ref-2-s) [↩t](#cite-ref-2-t) [↩u](#cite-ref-2-u) [↩v](#cite-ref-2-v) [↩w](#cite-ref-2-w) [↩x](#cite-ref-2-x) The Oregonian/OregonLive (Mike Rogoway), [“Intel has its first customer for its most advanced manufacturing process”](https://www.oregonlive.com/silicon-forest/2026/11/intel-has-its-first-customer-for-its-most-advanced-manufacturing-process.html?ref=signal-engine.ghost.io), 18 November 2026.
3. [↩a](#cite-ref-3-a) [↩b](#cite-ref-3-b) [↩c](#cite-ref-3-c) [↩d](#cite-ref-3-d) [↩e](#cite-ref-3-e) [↩f](#cite-ref-3-f) [↩g](#cite-ref-3-g) Microsoft and Intel, [“Microsoft and Intel deepen collaboration to deliver differentiated Azure infrastructure”](https://news.microsoft.com/source/2026/11/18/microsoft-and-intel-deepen-collaboration-to-deliver-differentiated-azure-infrastructure/?ref=signal-engine.ghost.io) (joint press release), dated 17 November 2026.
4. [↩a](#cite-ref-4-a) [↩b](#cite-ref-4-b) [↩c](#cite-ref-4-c) [↩d](#cite-ref-4-d) [↩e](#cite-ref-4-e) [↩f](#cite-ref-4-f) [↩g](#cite-ref-4-g) [↩h](#cite-ref-4-h) [↩i](#cite-ref-4-i) [↩j](#cite-ref-4-j) [↩k](#cite-ref-4-k) Tech Times (Jeremy Fielding), [“Microsoft Will Use Intel EMIB Packaging for Azure Silicon, but Release Omits Chip and Date”](https://www.techtimes.com/articles/331034/20261118/microsoft-will-use-intel-emib-packaging-azure-silicon-release-omits-chip-date.htm?ref=signal-engine.ghost.io), 18 November 2026.
5. [↩a](#cite-ref-5-a) [↩b](#cite-ref-5-b) [↩c](#cite-ref-5-c) [↩d](#cite-ref-5-d) [↩e](#cite-ref-5-e) TrendForce, [“Intel Scores Dual Foundry Wins: Microsoft Named First EMIB Customer; Tan Says 18A Secures First External Deal”](https://www.trendforce.com/news/2026/11/19/news-intel-scores-dual-foundry-wins-microsoft-named-first-emib-customer-tan-says-18a-secures-first-external-deal/?ref=signal-engine.ghost.io), 19 November 2026.
6. [↩a](#cite-ref-6-a) [↩b](#cite-ref-6-b) [↩c](#cite-ref-6-c) [↩d](#cite-ref-6-d) [↩e](#cite-ref-6-e) [↩f](#cite-ref-6-f) [↩g](#cite-ref-6-g) [↩h](#cite-ref-6-h) Crypto Briefing (edited by Diego Almada Lopez), [“Intel signs first outside customer for 18A process as yields reach 70%”](https://cryptobriefing.com/intel-first-external-customer-18a-process/?ref=signal-engine.ghost.io), 18 November 2026.
7. [↩a](#cite-ref-7-a) [↩b](#cite-ref-7-b) Tom's Hardware (Anton Shilov), [“Intel Foundry secures contract to build Microsoft's Maia 2 next-gen AI processor on 18A/18A-P node, claims report”](https://www.tomshardware.com/tech-industry/semiconductors/intel-foundry-secures-contract-to-build-microsofts-maia-2-next-gen-ai-processor-on-18a-18a-p-node-claims-report-could-be-first-step-in-ongoing-partnership?ref=signal-engine.ghost.io), 17 October 2025.

This article is for information only and is not financial or investment advice.

Spotted an error? Tell us and we'll correct it.